Kauai Lane Closures: Weekend of July 24- July 26

KAUAI LANE CLOSURES FOR
THE WEEKEND OF JULY 24 – JULY 26
 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice. 
All projects are weather permitting.

— KUHIO HIGHWAY (ROUTE 56) —

1) KAPAA (24-HOUR WORK)

Traffic on Kuhio Highway (Route 56) near mile marker 10 is shifted to the temporary Kapaa Stream Bridge 24-hours a day, seven days a week until further notice. For safety during the shift to the temporary bridge, right turns off Kuhio Highway onto Mailihuna Road are not permitted. Access to Kapahi is recommended via the Kawaihau Road or Hauala Road detours.

Kauai Lane Closures: Week of July 18- July 24

KAUAI LANE CLOSURES FOR
THE WEEK OF JULY 18 – JULY 24

PLEASE NOTE:

Lane closure schedules may change at any time without further notice. 
All projects are weather permitting.

— KUHIO HIGHWAY (ROUTES 56/560) —

1) KILAUEA

Single lane closure on Kuhio Highway (Route 56) in the southbound direction in the vicinity of mile marker 25, near Kalihiwai Road, on Monday, July 20, through Friday, July 24, from 7 a.m. to 5 p.m., for slope stabilization work. Alternating traffic is routed through the open lane.

2) KAPAA (24-HOUR WORK)

Traffic on Kuhio Highway (Route 56) near mile marker 10 is shifted to the temporary Kapaa Stream Bridge 24-hours a day, seven days a week until further notice. For safety during the shift to the temporary bridge, right turns off Kuhio Highway onto Mailihuna Road are not permitted. Access to Kapahi is recommended via the Kawaihau Road or Hauala Road detours.

3) HAENA

Single lane closure on Kuhio Highway (Route 560) in both directions at mile marker 8.7, Manoa Ford Crossing, on Monday, July 20, through Wednesday, July 22, from 7 a.m. to 5 p.m., for texturing and sealing work.

— RICE STREET (ROUTE 51) —

1) NAWILIWILI

Right lane closure on Rice Street (Route 51) in the southbound direction between Nawiliwili Harbor Mall and Waapa Road, on Monday, July 20, through Thursday, July 23, from 8 a.m. to 3 p.m., for utility maintenance work. Alternating traffic is routed through the open lane.

Kuhio Highway Lane Closures and Updates

— KAUMUALII HIGHWAY (ROUTE 50) — 

1) KILAUEA

Single lane closure on Kuhio Highway (Route 56) in the southbound direction in the vicinity of mile marker 25, near Kalihiwai Road, on Monday, July 13, through Friday, July 17, from 7 a.m. to 5 p.m., for slope stabilization work. Alternating traffic is routed through the open lane.

— KUHIO HIGHWAY (ROUTE 56/560) — 

1) KAPAA (24-HOUR WORK)

Traffic on Kuhio Highway (Route 56) near mile marker 10 is shifted to the temporary Kapaa Stream Bridge 24-hours a day, seven days a week until further notice. For safety during the shift to the temporary bridge, right turns off Kuhio Highway onto Mailihuna Road are not permitted. Access to Kapahi is recommended via the Kawaihau Road or Hauala Road detours. 

2) ANAHOLA (NIGHT WORK)

Single lane closure on Kuhio Highway (Route 56) in both directions between mile markers 15.5 and 16.7, Papaa Road and Koolau Road, on Sunday evening, July 12, through Friday morning, July 17, from 6 p.m. to 6 a.m., for road striping work. Alternating traffic will be routed through the open lane.

3) HAENA (ADDED JULY 13)

Single lane closure on Kuhio Highway (Route 560) at the Manoa Stream Crossing, near Haena Beach Park, for installation of joint sealant, epoxy, and armor stone. Working hours are 7 a.m. – 5 p.m. Wednesday, July 15, through Friday, July 17, 2020.

Link to DOT Website